CONCEPT · PROVISIONAL GEOMETRY · v1.3

Haidian Minds Converge · Jing-Zhang Stars Aglow
Tiangong Star Atlas AI Civic Living Room

The century-old Jing-Zhang legacy meets Haidian's innovation culture: Tianwen makes knowledge explainable, Nuwa makes collaboration participatory, and Yinglong makes climate resilience tangible. The structure remains three corridors, three cores, two wings, and one loop. The Tiangong Civic Protocol gives every AI-enabled public service a purpose, accountable owner, public evidence, expiry review, and exit path.

Overall concept
11.41M sqmprovisional design scope
310.8K sqmprototype footprint
12.34%green ratio
7.33%public-space ratio
3key areas

Tiangong Civic Protocol · Six Gates

01 Question register
Public problem and intended users
02 Data permission
Synthetic or licensed-data register
03 Spatial capacity
Access, fire, drainage, and crowd review
04 Human takeover
Named owner, stop control, offline route
05 90-day review
Baseline, incidents, feedback, correction
06 Renew or exit
Public decision and reversible removal

The protocol is an original implementation discipline, not statutory planning or a government commitment. A scenario that fails any gate cannot expand.

Eight-Resource Ecosystem · From Entry to Public Exit

Land · Space

Movable prototypes in provisional geometry, relocated after official GIS/CAD verification.

Industry · Talent

Public questions connect research, startups, services, and resident knowledge.

Compute · Data

Staged access records permission, ownership, expiry, and shutdown.

Scenario · Public Value

Ninety-day pilots test safety, inclusion, maintenance, and reversibility.

Three Scales · Regional Collaboration

43.6 sq km

Research scope

Interfaces with Zhongguancun, Beiwei Community, Future Science City, Huairou Science City, Beijing E-Town, and Beijing-Tianjin-Hebei.

11.4 sq km / provisional

Overall design scope

Tianwen, Nuwa, and Yinglong organize innovation, community, industry, and blue-green systems.

3 cores

Key design scope

Ninety-day pilots test each prototype before any expansion.

Three scales and spatial structure

Three Key Areas · Action Briefs

ZHONGZHIYUAN

Tianwen Test Port

Model evaluation bench, edge demonstration, quiet knowledge garden.

Lead: park operator
Gate: fire/load, licensed data, researcher sign-off
Indicators: public briefs, completion, human review
AI ORIGIN

Nuwa Civic Weave

Civic workshop, AI-literacy exhibit, demountable public table.

Lead: community operator
Gate: accessibility, consent/exit, child safeguards
Indicators: diversity, closure, response time
DAZHONGSI

Yinglong Urban Interface

Product validation, Jing-Zhang culture, rainwater and low-carbon mobility.

Lead: district operator
Gate: heritage, drainage, light, crowd safety
Indicators: response, walking continuity, uptime
Three key-area briefs and 90-day loop

Land Use · Mobility · Blue-Green Public Realm

Mixed functions

Research, validation, talent community, public experience, and resilience form a loop; land use remains conceptual.

Walking first

Walking and wheelchairs, cycling, booked low-speed shuttles, maintenance, then emergency access.

Flexible curb

Pickup, logistics, rain pause, and events switch by time without blocking accessibility.

Tangible resilience

Rain gardens, shade, microclimate notices, and slow mobility become maintainable infrastructure.

Mobility and blue-green network

Buildings · Renewal Projects

Tianwen Cloud Terrace

Research, evaluation, and public gallery.

Nuwa Weave Nest

Shared court, live-work, and repair spaces.

Yinglong Water Court

Lifted public floor, rain garden, deep eaves.

Star Atlas Interface

Accessible transfer, service, and exhibitions.

Renewal sequence: inventory → maintain → program infill → retrofit → open interface → conditional replacement. No parcel-level demolition, FAR, or height claim precedes professional surveys.

Building prototypes and continuous civic ground floor

Six Personas · One Public-Service Threshold

Researchers and model engineers

Safe evaluation, explainable evidence, and a staffed booking desk.

Startup and industry-service teams

Validation, compliance, market translation, and a human service window.

Residents, older adults, low-digital-literacy users

Plain language, paper access, and a working opt-out path.

Children, students, and teachers

Teacher-led learning, safeguards, and source review.

Commuters, disabled people, slow-mobility users

Continuous accessible routes and visible staffed help.

International visitors and developers

Multilingual context, open contribution, and correction closure.

AI Scenarios · Human in the Loop

01 Model evaluation
Synthetic/licensed data
02 Edge trial
On-site stop control
03 Trusted data
Steward audit
04 Accessible guide
User confirms route
05 Civic co-creation
Facilitator review
06 Learning companion
Teacher in loop
07 Health guide
No diagnosis
08 Multilingual story
Historical review
09 Mobility advice
No enforcement
10 Compliance assistant
Legal review

Three Landmarks · Six Replaceable Public Components

Tiangong Cloud Terrace

Explainable-AI gallery and Star Atlas contributor wall.

Nuwa Weaving Table

Public protocol reading and resident-developer collaboration.

Yinglong Water-Vein Platform

Jing-Zhang culture, climate sensing, and low-carbon mobility.

Component library: protocol sign, demountable table, staffed desk, low-glare guidance, rainwater sensor node, and contribution archive. Recognition is human-reviewed, traceable, and never a guaranteed award.

Three-Act Culture · Jing-Zhang, Zhongguancun, AI

Act I · Centennial Jing-Zhang

A verified timeline conveys mobility, engineering, and civic memory without imitating historic forms.

Act II · Zhongguancun

Open research, founder support, and problem collaboration become spatial interfaces.

Act III · New AI Culture

Versions, evidence, correction, and exit create participatory contemporary culture.

Four Seasons · Auditable Annual Outputs

Spring

Question register

Publish memory and urban problem calls.

Summer

Open week

Developer residency and three controlled prototypes.

Autumn

Exchange season

Multilingual demos, exchange, and cultural correction.

Winter

Evidence day

Publish cost, benefit, and renew-or-exit decisions.

Phasing · Decision Gates

0-6 months

Verify

Official base, site audit, conflict register, public baseline.

6-18 months

Prototype

Three 90-day pilots, accessibility audit, ethics and maintenance manuals.

18-36 months

Connect

Continuous corridor segments, shared interfaces, annual evaluation.

After year 3

Iterate

Evidence determines expansion, adjustment, or exit.

Evidence · Checks · Official-Data Replacement

Evidence chain and decision gates

Official GIS/CAD is not yet available. When received, verify source and coordinates, overlay conflicts, relocate key-area tasks, recalculate metrics, update every artifact, and obtain professional sign-off. Official geometry is never altered to fit the concept.

Sources: official call, site package, agent taskbook, repository source registry, and local standards snapshots.

Assumptions: provisional boundaries; controls, ownership, buildings, utilities, ecology, heritage, and KPI baselines pending.

Check status: structured data, figures, bilingual views, and offline artifacts rebuilt for v1.2; exact areas remain provisional.

Public gates: continuous accessibility, non-digital access, staffed service, minimum data, opt-out, and appeal.